mains cable造句
例句与造句
- Main cable connected up with incorrect polarity
主电缆的极性接驳错误。 - Technique conditions of ppws for main cable of the suspension bridge
悬索桥预制主缆丝股技术条件 - Main cable undersized when compared to main switch rating
与总开关掣的额定值比较,主电缆的尺寸过小。 - Inspection main cable installation for wheel house before paneling decoration
敷板前驾驶室检查主干电缆安装 - Accurate nonlinear analysis of tower and cable in construction of main cable for suspension bridge
悬索桥索股架设全过程的非线性精确分析 - It's difficult to find mains cable in a sentence. 用mains cable造句挺难的
- In data communications , a network topology in which workstations are connected by t junctions to one main cable
数据通信技术中的一种网络拓扑结构,其中各个工作站通过t型接头与主电缆相连。 - Authors presented main cable safety factors assessment of long - span suspension bridges based on inverse reliability method
摘要提出了一种基于逆可靠度法的大跨悬索桥主缆安全系数评估方法。 - There are 27 , 572 wires used in one main cable on the golden gate bridge in san francisco . the bridge has two main cables
旧金山的金门大桥一共有两根主吊索,每根主吊索上使用了27572条金属丝。 - The tensile forces of main cable , the geometric alignments , the stresses of tower , suspenders , and stiffened beams in various stages were obtained
获得了各阶段大缆张力、几何线形及主塔、吊索、加劲梁的应力分布情况。 - Skin the insulation material of wires with a length 5 cm more than that of wire clip , and hang c form parts and splitting wire on the main cable , and then insert the wedge between the two wires with force
剥离绝缘导线绝缘层,剥离长度应大于线夹长度5厘米,将c形元件和分接线一起挂在主线上,将楔块用力插入两导线之间。 - Abstract : through the geometric factor analysis of main cable in erection , the calculation formula of internal force of main cable is given and the analysis method of main cable safety is also discussed in detail
文摘:通过对缆索吊装设备主索的几何因素分析,给出了主索的内力计算与验算公式,结合示例详细介绍了主索安全度分析方法。 - The suspension bridge consists of the following parts : bridge tower , main cable , hanger rod , stiffened girder and anchor bank . in the past , analytic method based on the suspension mechanics was mostly adopted in stress analysis of suspension bridge
过去对悬索桥的受力分析多采用基于悬索力学的解析法,将主缆、加劲梁以及索塔各部分化整为零,对各部分的受力情况单独考虑,并且分别计算各自的内力。 - In the static analysis of the suspension bridge , the initial shape and initial strain of the main cable under bridge - finished condition should be defined firstly , then the bridge - finished condition should be chosen as the initial condition , under which the fem model was built . 3
悬索桥成桥恒、活载作用下的静力分析,首先需要确定成桥状态下主缆索的初始索形和主缆索的初始应变,再以成桥状态为初始状态建立有限元模型; 3 - Dynamic performance of pingsheng bridge and the ground - anchored suspension bridge model , which has the same structural parameters as pingsheng bridge , is calculated . furthermore , the influence on dynamic performance for pingsheng bridge of structural parameters , such as rise - span ratio of main cable , dead load
6 .针对大跨度自锚式悬索桥可能存在的风致振动,对平胜大桥进行了节段模型和全桥模型风洞试验研究,研究表明:平胜大桥具有足够的抗风稳定性。
更多例句: 下一页